Hi,
Continuing from thread: Starting planning process from a specified period
I have configured a MDT attribute: "Active Date" having data type as timestamp and "MDTATTR" having data type as Decimal to Product MDT.
This was then added to the Planning Area and observation was as follows:
Can someone please tell how can the situation given in Fig 3 of the above diagram be achieved?
Regards,
Sourojit