IBP for Response - required ECC version

$
0
0

Hello Everyone

 

We are looking into IBP response & supply, which uses Smart Data Integration (SDI). The source system would be an SAP ECC system but so far we were not able to determine if there is a minimum system requirement for the SAP ECC system in order to work with SDI. We assume it would need to be at least and SAP 6.0 system - but what minimum EHP and what SPS level is required?

 