Hi,
I have configured my planning area with supply planning operators SCM. I have also provided right user entitlements so that the supply planning engine is available in the excel add-in for running.
I have also successfully generated the Consensus demand plan. Apart from this I've uploaded key figure data for customer ratio, location ratio,transport ratio, and also the mppings in PRODUCTIONSOURCE (i.e. LOC-PRD-SRC ID), PRODUCTIONSOURCERESOURCE tables.
The simulate button in the excel add-in shows unconstrained / constrained demand and supply planning. However, on running any of the options, the dependent customer / location demand qtys are not getting generated.
Request your guidance in this regard as I am unable to identify the root cause of the problem.
Thank you,
Atri Kundu